
wychwood
This project involved refreshing two bathrooms along with making updates to the basement.
In the basement bathroom, we reconfigured the shower from a three-sided alcove to a more open two-sided layout, instantly making the space feel larger and more inviting. We added fresh finishes including new paint, trim, vanity, mirrors, and light fixtures.
Upstairs, the focus was on remodelling with longevity in mind. By upgrading to higher-quality materials, this bathroom is now designed to look beautiful and perform well for the next 20–30 years. Like the basement, it received a complete refresh with all-new finishes and fixtures.
Beyond the bathrooms, we also transformed the basement flooring, replacing outdated shag carpet with durable glue-down vinyl — a practical and stylish upgrade for everyday living.
6 WEEKS
Project Duration
$43,000
Renovation Cost
600 sqft
Square Footage (Above Grade)